User Tools

Site Tools


group

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
group [2018/09/23 17:12] – [Temporary Positions and PhD Students (Principle Supervisor)] potthastgroup [2018/09/23 21:06] – [Upcoming Positions] potthast
Line 25: Line 25:
   * P06: Head KENDA, Obs-Operators LAM, Ensemble-DA [CS]   * P06: Head KENDA, Obs-Operators LAM, Ensemble-DA [CS]
   * P07: Operations+Algorithms KENDA, BACY [HR]   * P07: Operations+Algorithms KENDA, BACY [HR]
-  * P08: Radar Data Assimilation (LHN, Volume), GPS/GNSS Observations [KS]+  * P08: Radar Data Assimilation KENDA (LHN, Volume) [KS]
   * P09: Head SINFONY, Radar Operator and Assimilation, NWC+NWV Integration [UB]   * P09: Head SINFONY, Radar Operator and Assimilation, NWC+NWV Integration [UB]
   * P10: Satellite DA for Local Area Models, Boundary Layer DA [AS]   * P10: Satellite DA for Local Area Models, Boundary Layer DA [AS]
Line 91: Line 91:
 ===== Upcoming Positions ===== ===== Upcoming Positions =====
  
-**Permanent Positions to come (advertisement ongoing):**+**Permanent Positions to come (now moved to above, advertisement ongoing):**
  
   * Renewal of Staff Position after retirement: 1 position in 01/2019, MetBW   * Renewal of Staff Position after retirement: 1 position in 01/2019, MetBW
group.txt · Last modified: 2023/04/14 07:36 by potthast