User Tools

Site Tools


group

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
group [2018/12/21 11:23] – [Current group members] potthastgroup [2019/06/16 16:31] – [Upcoming Positions] potthast
Line 8: Line 8:
 ====== Current group members ===== ====== Current group members =====
  
-Senior Scientists, Postdocs, Junior Scientists and PhD students (state January 2019). +Senior Scientists, Postdocs, Junior Scientists and PhD students (state June 2019). 
 Following data protection laws I have removed all personal information about group Following data protection laws I have removed all personal information about group
-members from this website. Currently there are about 38 members in my group  +members from this website. Currently there are 36 members in my groupplus a master student  
-plus students with main and co-supervision, some people are on parental leave. +and 7 phd students with main and co-supervision, some people are on parental leave. 
  
 ===== Permanent Positions ===== ===== Permanent Positions =====
Line 33: Line 33:
   * P13: VIS Operator, Adjoint Operators, Interchannel Corr, IR/MW DA [OS]   * P13: VIS Operator, Adjoint Operators, Interchannel Corr, IR/MW DA [OS]
   * P14: Surface Fields DA, SST, Snow, Ice, Soil Moisture Ass SMA [ML]   * P14: Surface Fields DA, SST, Snow, Ice, Soil Moisture Ass SMA [ML]
-  * P15: {MetBW Position} Satellite IR/MW/VIS [NN]+  * P15: {MetBW Position} Satellite IR/MW/VIS [LB]
  
   * P16: Satellite DA, Radiances IR/MW [MB] (from Jan 1, 2019)   * P16: Satellite DA, Radiances IR/MW [MB] (from Jan 1, 2019)
Line 43: Line 43:
  
    * T01: {50%} PC Scores Satellite Radiances [SM]                             Core Funding 2017-2020, [2015-17]       * T01: {50%} PC Scores Satellite Radiances [SM]                             Core Funding 2017-2020, [2015-17]   
-   <color #6666aa>T02: GPS/GNSS Assimilation/Tomography [MB]                                SFP/IAFE 2015-2018, [2012-15]</color> +   * T02: Lightning DA [LN]                                                    IAFE Sinfony 08/2017-2021    
-   * T03: Lightning DA [LN]                                                    IAFE Sinfony 08/2017-2021    +   T03: Development of Ensemble Reanalysis System [TR]                       HErZ 2016-2019       
-   T04: Satellite DA over Land [KR]                                          IAFE ICON-SAT-IR 1 2016-2020 +   T04: Data Assimilation RADAR Refl+Objects [CW]                            IAFE Sinfony 2017-2021   
-   * T05: Development of Ensemble Reanalysis System [TR]                       HErZ 2016-2019       +   T05: SEVIRI IR Data Assimilation in KENDA [AH]                            IAFE KENDA-IR 2015-2019 
-  + 
-   T06: Data Assimilation of VIS-SEVIRI [LB]                                 IAFE Sinfony 2017-2021 +   T06: mFund Flottenwetterkarte, Car Data [ZP]                              BMVI 10/2017-08/2020 
-   * T07: Data Assimilation RADAR Refl+Objects [CW]                            IAFE Sinfony 2017-2021   +   T07: mFund Flottenwetterkarte, Ultra-Rapid DA [WA]                        BMVI 11/2017-08/2020         
-   <color #6666aa>T08: Eumetsat Fellowship, Wind Rec from IR DA [MP]                        EUMETSAT 2017-2019</color>       +   T08: IR/MW Radiances [MP]                                                 IAFE 2019-2020, [2015-17] 
-   * <color #6666aa>T09: SEVIRI IR Data Assimilation in KENDA [AH]                            IAFE KENDA-IR 2015-2019</color> +   T09: Boundary Layer relevant Observations in KENDA [CSg]                  gridcast 2019-2021 
-   T10: mFund Flottenwetterkarte, Car Data [ZP]                              BMVI 10/2017-08/2020 +   T10: RTTOV Operator and NWP-SAF work [CSt]                                NWP-SAF 2018-2022 
-     + 
-   T11: mFund Flottenwetterkarte, Ultra-Rapid DA [WA]                        BMVI 11/2017-08/2020         +   T11: MFASIS Operator Development, SEVIRI VIS Clouds + Aerosol [LS]        IAFE 2019-2022 
-   T12: IR/MW Radiances [NN]                                                 IAFE 2019-2020, [2015-17] +   T12: Algorithmic Development Data Assimilation  [TSt]                     Core Funding 2018-2021 
-   T13: Boundary Layer relevant Observations in KENDA [CSg]                  gridcast 2019-2021 +   T13: 3D-Volume RADAR Data Assimilation [KK]                               IVS Precipitation 2018-2022 
-   T14: RTTOV Operator and NWP-SAF work [CSt]                                NWP-SAF 2018-2022 +   T14: EnVar algorithmic development [MaBu]                                 IVS Precipitation 2018-2022 
-   T15: MFASIS Operator Development, SEVIRI VIS Clouds + Aerosol [LS]        IAFE 2019-2022 +   T15: RealPEP Polarimetric RADAR Data Assimilation [KV]                    DFG Research Group 2019-2021    
-    + 
-   T16: Algorithmic Development Data Assimilation  [TSt]                     Core Funding 2018-2021 +   T16: Polarimetric RADAR Operator [JM]                                     DFG PROM 2019-2021     
-   T17: 3D-Volume RADAR Data Assimilation [KK]                               IVS Precipitation 2018-2022 +   * T17: Rapid Update Cycle [SU] IAFE SINFONY 2018-2020
-   T18: EnVar algorithmic development [MaBu]                                 IVS Precipitation 2018-2022 +
-   T19: RealPEP Polarimetric RADAR Data Assimilation [KV]                    DFG Research Group 2019-2021    +
-   T20: Polarimetric RADAR Operator [NN]                                     DFG PROM 2019-2021    +
        
-   P1: PhD Student No 14, Reading, Ensemble DA with Radiances [JO]          UoR/Uni Wisconsin 2015-2019 +   S1: PhD Student No 14, Reading, Ensemble DA with Radiances [JO]          UoR/Uni Wisconsin 2015-2019 
-   P2: PhD Student No 17, Reading DA model reconstruction [BO]              UoR/GOV  2015-2019 +   S2: PhD Student No 17, Reading DA model reconstruction [BO]              UoR/GOV  2015-2019 
-   P3: PhD Student No 15, Reading, DA for Neural Delay Equations [JA]       UoR/GOV 2014-2019       +   S3: PhD Student No 15, Reading, DA for Neural Delay Equations [JA]       UoR/GOV 2014-2019       
  
 <sub> <sub>
Line 82: Line 79:
 ===== PhD Students Co-Supervisor ===== ===== PhD Students Co-Supervisor =====
  
-   P4: PhD Karlsruhe, DA for ART Models, [LM]             Co-Supervisor, 2018-2020, with Prof. Christoph Kottmeier, Dr. Bernhard Vogel +   S4: PhD Karlsruhe, DA for ART Models, [LM]             Co-Supervisor, 2018-2020, with Prof. Christoph Kottmeier, Dr. Bernhard Vogel 
-   P5: PhD Karlsruhe, DA for ART Models, [VB]             Co-Supervisor,  2017-2020, with Prof. Christoph Kottmeier, Dr. Bernhard Vogel +   S5: PhD Karlsruhe, DA for ART Models, [VB]             Co-Supervisor,  2017-2020, with Prof. Christoph Kottmeier, Dr. Bernhard Vogel 
-   P6: PhD Imperial College/University of Reading, [OL]   Co-Supervision, 2016-2019, with Prof. Dan Crisan and Prof. Peter-Jan van Leeuwen +   S6: PhD Imperial College/University of Reading, [OL]   Co-Supervision, 2016-2019, with Prof. Dan Crisan and Prof. Peter-Jan van Leeuwen 
-   P7: PhD La Reunion, SAT-DA with KENDA, [FK]            Co-Supervision, 2016-2019, with Dr. Sylvain Cross/Reuniwatt Paris                   +   S7: PhD Karlsruhe, Life Cycle Predictions for NWC      Co-Supervisor, 2017-2019, with Prof. Michael Kunz, Dr. Uli Blahak, Dr. Kathrin Wapler
-   * P8: PhD Karlsruhe, Life Cycle Predictions for NWC      Co-Supervisor, 2017-2019, with Prof. Michael Kunz, Dr. Uli Blahak, Dr. Kathrin Wapler+
  
 ===== Upcoming Positions ===== ===== Upcoming Positions =====
  
-**Permanent Positions to come (now moved to above, advertisement ongoing):**+**Permanent Positions to come:** 
 + 
 +  none currently
  
-  * Renewal of Staff Position after retirement: 1 position in 01/2019, MetBW +**Temporary Positions:**
-     +
-**Temporary Positions (now moved to above, advertisement ongoing):**+
  
-  Postdoc (3 Years, DFG) in 7/2019 (Supervision AS+  Postdoc (3 Years, DFG) in 7/2019 (Supervision AS)
-  * Postdoc (3 Years, DFG) in 1/2019 (Supervision RP) +
-  * Postdoc (IAFE Programme, 4 Years) in 2019 (Supervision UB) +
-  * Postdoc (IAFE Programme, 4 Years) in 2019 (Supervision UB) +
-  * Postdoc (IAFE Programme, 4 Years) in 2019 (Supervision RP)+
  
 <sup> <sup>
group.txt · Last modified: 2023/04/14 07:36 by potthast